Thursday, 30 January 2014

000-122 Exam Sample Questions Set

QUESTION NO: 1

An environment for a popular ISV application used on Power Systems must be sized. Which IBM tool or resource should be used?

A. Techline
B. eConfigurator
C. Facts and Features
D. System Planning Tool

Answer: A

QUESTION NO: 2

What is the benefit of using the Active Memory Expansion feature in Power Systems servers?

A. Memory capacity will virtually be doubled.
B. Memory will be disk-cached to improve performance.
C. Memory will be allocated to an LPARto improve performance.
D. Memory contents are compressed to allow for greater utilization.

Answer: D

QUESTION NO: 3

A customer is moving a small application from an existing POWER7 server to a new system in a new location. They will be moving an existing 12X I/O drawer to the new server Which of the following configuration will support a 12X PCI-X expansion drawer?

A. A4-corePower710
B. A 4-core Power 720
C. A 6-core Power 730
D. A 6-core Power 720

Answer: D

QUESTION NO: 4

When moving an HP-UX based application workload from an HP Superdome onto a Power
Systems server, which operating system will provide the easiest transition'?

A. AIX
B. IBMi
C. Red Hat Enterprise Linux
D. SuSe Linux Enterprise Server

Answer: A

QUESTION NO: 5

Which of the following Power Systems design functions allows the system to identify situations which can result in a system outage?

A. Light Path Diagnostics
B. Electronic Service Agent
C. First Failure Data Capture
D. Alternate Processor Recovery

Answer: C

No comments:

Post a Comment

Note: only a member of this blog may post a comment.